Balance Remodeling offers a full slate of renovations services from Design/Build to creating spectacular Kitchens and Bathrooms.

Pricing Your Project

A general cost guide for various projects.

 How much does stuff cost?!

As a consumer, this is one of my top “Google” questions!

  Of course, you want to confirm that you are making the right decisions about what you spend on your project. You want to feel comfortable that you will receive the right products, have them expertly installed and receive a fair price for your investment. You can find exact pricing for many goods on the internet, but with Home Remodeling projects sources we choose for information can be ways for companies to gather your personal information as well offer vague answers that are not helpful to your particular project.

  First, I want to make sure I am clear on a couple of brief points. The pricing I offer here is for full scale remodeling, not “refreshing a space” or partial projects. I want to portray accurate “ballparks” based on my 40 years of remodeling in Maryland. This pricing will vary on individual projects based on final designs and scope of work. They also will vary based on selections of the finishes in any given project. I will try to include a basic list of included items for comparison purposes in the projects. Certain larger projects are more difficult to attach any pricing to until a site visit is made to see conditions and discuss the intended results. This list will provide you with an accurate estimated cost to begin making informed decisions. If you have a project not covered, I would be happy to discuss it with you, please contact me so we can set up a phone appointment.

 

Bathrooms

Master Bath- Remodel existing

Including:

Remove and haul away all finishes to subfloor and bare drywall

Soaking Tub

Double Bowl Vanity

Separate Shower

Toilet

Tile on Floor and on Shower walls up to the ceiling

Tile installed over new underlayment and cement based tile board in shower with waterproofing applied.

Cabinetry and Granite top with undermount sink allowance ($2,350.00)

Electrical and Plumbing to code

Kohler or equal Fixtures

Paint with Sherwin Williams Duration Paints.

Estimated: $45,000 - $70,000

Hall Bath 5’ x 8’

This is the standard bath we find in most of our center hall colonial homes

Includes:

Demolition

Steel Tub

Single Bowl Vanity and Granite top with undermount sink Allowance ($1,300.00)

Toilet

Floor Tile over waterproof underlayment

Tile on Tub walls to ceiling over waterproofed cement board

Kohler or equal fixtures

Paint with Sherwin Williams Duration Paints

Estimated: $25,000 to 29,000

 

Master Suite Addition

Includes:

Design and creating Permit ready plans

Permits

Construct addition up to 500 sq. ft. addition over crawl space foundation

White Vinyl Windows and Vinyl Siding

Electrical, Plumbing and HVAC to code - permits included

Recess Lighting

Large Bathroom with Double bowl vanity and granite tops with undermount sinks

Walk-In Shower

Soaking Tub

Toilet area

Tile finishes in Bathroom over waterproofed substrates

Hardwood Flooring in Bedroom

Walk-In closet with standard rod and shelving

Paint with Sherwin Williams Duration paints

Estimated: $135,000 to $175,000

 

Kitchens

Remodel Existing up to 200 sq. ft. (average)

Including:

Demolition of existing

Professional Cabinet planning

Minor carpentry (move non-bearing wall or soffit)

Install stock cabinetry (not semi-custom or custom)

Install Granite tops with Stainless steel undermounted sink

Cabinet/Top Allowance ($15,000.00)

Install wood flooring

Tile backsplash install

Paint with Sherwin Williams Duration paints

Estimated: $60,000 - $80,000

 

Kitchen Addition up to 175 sq. ft.

Including:

Design and creating plans for permits

Permits

Professional Kitchen planning

Construct addition over crawlspace foundation

Minor interior carpentry (remove Non-bearing walls and soffits or closets)

Plumbing, Electrical and HAVC to code including permits

Vinyl Siding and Windows

Cabinetry and Granite tops with stainless steel undermount sink allowance ($17,000.00)

Hardwood Flooring

Tile backsplash

Paint with Sherwin Williams Duration paints

Estimated: $85,000 to $100,000

 

Basements up to 800 sq. ft. (average)

Including:

Design and Permits

Construct with 2x4 framing

Plumbing, Electrical and HVAC per code including permits

LED Recess Lighting

Insulate perimeter walls

Drywall walls and ceilings

Three-piece bathroom with Shower, Toilet and single bowl vanity with granite top

Kohler or equal fixtures

Luxury Vinyl Plank Flooring

Estimated: $80,000 to $90,000

Add Egress Window and Bedroom

Additional cost $4000 to $6000

 

Two Story additions and add a level, Second-Floor additions

To create an accurate “ballpark” for this kind of work requires an in-home visit by one of our team to gather information and dimensions. Once this is done a preliminary initial estimate can be created before moving into the design process.

 

 

 

Note: Please keep in mind that all presented pricing can change based on the client selections and final scope of work. In all cases it is possible to save cost or add cost. In many cases we at Balance Remodeling will work with our clients presenting many different paths to choose from in order to help our customer create their dream home! In my experience these numbers fairly represent the final pricing of any given project. Please contact us if you have any questions, we look forward to hearing from you.